Start
June 2013
End
June 2013

Civil engineering works as part of London Underground’s modification of the signalling system of the Metropolitan Line in advance of the introduction of the new S type rolling.

Client: London Underground

VGC Contract value: £260k

Key features:

  • Signal bases and cable routes
  • Interface with operating railway
  • Most work undertaken in engineering hours