What an example to all: fantastic set-up.
Excellent first impresssions due to site and operatives’ appearance; very good pedestrian management; on-site storage of materials, equipment and waste was very good.

Health and safety advisor – CVU

Thank you all for the safe delivery at Burnt Oak over the weekend. The gangs were vigilant in looking after each other’s safety, and delivered an accident-free weekend.
All of the site was tidy throughout the weekend, and all the scrap was cleared, leaving the site in immaculate order.
Your hard work and dedication helped us to install 40m of fibre reinforced ballast at the trial site and complete one pull of stressing.
Please cascade our thanks to the gangs for their hard work and effort.

Project manager – ballast track renewals – Track Partnership

When on site at Kings Cross, I was very impressed with Viorica’s work ethic. She would do any task that was asked of her with a good attitude and was one of the hardest-working labourers I have seen

Senior delivery engineer – Track partnership

A huge round of applause to all of you for the success we all share on completion of the M1 junction 19 improvement scheme. It has been a fantastic project – thank you for your support and enthusiasm.

Operations director – M1 jn19 – Skanska

A tidy site with works being carried out to a high standard of quality and health and safety with due care for pedestrians and road users.

Senior manager – Volker Highways – CVU

Just a quick thank you from me for the efforts made by VGC this weekend. I was impressed with the way the station assets were protected and the professional attitude of your staff.
I was particularly impressed with your supervisor.
Please feel free to pass on my thanks.

General manager – VolkerRail