Ilford platform ATF
Start
October 2017
End
Current
Client
Costain
Location
East Anglia
VGC contract value
£2.2 million

VGC is constructing the auto-transformer feeder (ATF) cable infrastructure as part of the electrification of the Crossrail Anglia route.

The works include ARCO and TTS route installation (wall, buried and surface) along the cess and a number of signalling location (LOC) suite installations.

The most technically challenging section was the buried ATF route through six station platforms plus the installation of 23 cable chambers.

VGC is providing the subcontract works for sections

  • Rabbits Road to Ilford ATF installation
  • Ilford station ATF installation
  • Ilford to Seven Kings ATF installation
  • Seven Kings station ATF installation (and accompanying handrail)
  • Goodmayes station ATF installation
  • Gidea Park ATF installation
James Piercy
James Piercy is one of our Be Safe by Choice key influencers on the project.

Normal train services were maintained throughout.

Seven Kings platform works
At Seven Kings station we are creating 30m of buried ATF route under platform 4 through major space constraints and large buried concrete obstacles

This project is part of the eight-mile section of Crossrail Anglia from Manor Park, east London, to Gidea Park in Essex being undertaken by Costain. The project involves track renewals, installing overhead line equipment, turn back facilities, and station improvements at eight stations along the route.

The Seven Kings ATF installation team was commended by Hochtief (principal contractor for the station upgrade) who noted the high standards and best practice of the temporary works.

Key influencers: James Piercy, Michelle Jones, Josh Cormack, Lewis Horne