![Sixteen Crossrail projects VGC staff at Crossrail Whitechapel](https://vgcgroup.co.uk/wp-content/uploads/2015/12/DSC5216-web.jpg)
| Costain, Skanska, Geoffrey Osborne, Balfour Beatty, Morgan, Vinci, BAM, Ferrovial, Kier, Alstom, TSO, Keltbray |
| ongoing |
| London |
| Apr 2012 |
| Dec 2020 |
![HS2 Chalk Farm enabling works Chalk Farm HS2 enabling](https://vgcgroup.co.uk/wp-content/uploads/2018/08/Chalk-Farm-HS2-enabling-Murphy.jpg)
| Network Rail through Murphy Group |
| £120,000 |
| Juniper Crescent, London |
| Oct 2016 |
| Dec 2016 |
![Crossrail Anglia work sections Road-rail-vehicle at Crossrail Brentwood engineering](https://vgcgroup.co.uk/wp-content/uploads/2015/11/DSC7161-web.jpg)
| Costain, Keltbray |
| £15 million |
| East Anglia |
| Jun 2015 |
| Jul 2019 |
![Crossrail C610 systemwide fit-out Tunnels ATC copyright Crossrail](https://vgcgroup.co.uk/wp-content/uploads/2017/11/ATC_tunnels.jpg)
| Alstom Transport / TSO / Costain joint venture |
| ongoing |
| London |
| May 2015 |
| Dec 2019 |
| Costain Skanska Joint Venture |
| ongoing |
| Central London |
| Jan 2014 |
| Aug 2020 |
![Farringdon station – Crossrail](https://vgcgroup.co.uk/wp-content/uploads/2013/10/Farringdon-408x249.jpg)
| Bam Ferrovial Kier JV (Crossrail) |
| £6 million |
| Farringdon station, London |
| Jan 2013 |
| Current |
![Whitechapel Crossrail station VGC staff at Crossrail Whitechapel](https://vgcgroup.co.uk/wp-content/uploads/2015/12/DSC5216-web.jpg)
| Balfour Beatty Morgan Sindall Vinci joint venture |
| ongoing |
| Central London |
| Apr 2012 |
| Current |
| Balfour Beatty |
| £2 million |
| South east London |
| Jan 2014 |
| Dec 2017 |